- Inspection of a failed Shell and tube evaporator
- Damage of copper tubes from a failed water chilling unit.
- Failed tube taken from a shell and tube evaporator
Process cooling and essential chilled water supplies can not be provided reliably on a 24/7 all year round basis from a water chilling unit constructed for comfort cooling operating only in a cooling season of no more than six months.
The misapplication of chilled water generating equipment leads to premature chiller failures, costly repairs and higher charges until the problems have been solved.
Other misapplications with an installation comprising of more than one water chilling unit is how they are installed with respect to water flow and control. Mixed flow of the chilled water from two or more chillers can lead to freezing of water in the evaporator rendering the complete water chiller unfit for further use.
We have, over the past twenty years, been involved in over sixty water chilling unit investigations in the UK and overseas, resulting in more than sixty technical reports to be issued.
We have, in the majority of cases, been able to resolve the client's operational problems in agreement with manufacturers and contractors. However, on three occasions we have represented clients in Court where litigation has been necessary.